Real-world water, on the bench.
We're building a benchtop rig that tests new water-filtration materials against realistic river freshwater, so the ones that work in the lab also work in the field.
A vertically integrated project at the University of Bath
Clean tap water isn't something to take for granted.
As one may predict, England's tap water passes almost every test. You can safely drink it.
But... The rivers and reservoirs it comes from are under growing pressure.
-
14.3%
of England's rivers and lakes are in “good” ecological health...
-
None
are in good chemical health.
Source: Environment Agency, August 2026 (via Water Magazine)
-
110 of 117
waters tested for PFAS (“forever chemicals”) would fail proposed safety limits.
-
291,492
sewage spills from storm overflows in 2025.
-
5 billion litres a day
England's projected public water shortfall by 2055, about a third of what we use today.
-
About 71%
of England, including the Wessex region, was in drought in August 2026, after the driest July since records began in 1836.
Treatment works must make safe water from dirtier, scarcer sources, including micropollutants like PFAS, pharmaceuticals and heavy metals, all of which survive conventional treatment. The government is overhauling the sector, and Ofwat is to be replaced by a single new regulator. New filtration materials will be part of the answer, but only if they can be tested properly.
All sources for this section
- Drinking Water Inspectorate: Chief Inspector's Report 2025 (July 2026)
- Water Magazine: Latest Environment Agency data on river health (August 2026)
- PFAS above proposed safety limits in almost all English waters tested (July 2025)
- Environment Agency: Fewer and shorter storm overflow spills in 2025 (March 2026)
- Environment Agency National Framework for Water Resources (June 2025)
- ITV News: Almost three-quarters of England in drought (August 2026)
- Addleshaw Goddard: What the Water White Paper means (January 2026)
- UKWIR: Chemicals Investigation Programme
Lab results don't always survive the river.
Filtration materials can perform well in the lab and then fail in the field. Real freshwater, with its mix of organic matter, microbes, and changing flows and temperatures, is hard to recreate. Our platform brings those conditions to the bench.
How it works
-
Feed
Pumps push a test solution designed to mimic real freshwater through the rig. Flow, pressure and temperature are all adjustable.
-
Test
Materials sit in a modular chamber with up to three stages, so they can be tested alone or in series. These can be membranes, cartridge filters, or enzymes and microbes fixed onto hydrogels and porous scaffolds.
-
Sense
Printed electrode sensors before and after the chamber compare what goes in with what comes out. They're designed to detect heavy metals (lead, cadmium, mercury, arsenic, copper), pH, and optionally nitrate, ammonium and chloride. Temperature and dissolved-oxygen sensors run alongside.
-
Refresh
Sensors get coated with biofilm over time. A roll-to-roll mechanism swaps in a fresh sensor every 24 hours.
-
Stream
A modified open-source potentiostat streams live readings to our desktop app, which also controls the pumps, valves and temperature.
Who it's for
-
Direct users
Materials and membrane developers, such as R&D labs and treatment and technology companies.
-
Downstream
Water utilities and regulators, who approve materials and are responsible for water quality.
-
Ultimately
Freshwater ecosystems and everyone who relies on clean water.
Year 1 goals
- Build the flow rig.
- Develop the self-replacing sensor module.
- Develop a multiplexed screen-printed electrode.
- Modify the open-source Rodeostat potentiostat and design a board for potentiometric measurements.
- Write the desktop app.
- Write the system controls.
- Validate the system with known standards.
Timeline
-
Milestone 1 14 October – 4 November 2026
- Schematics for circuit boards, sensors and rig complete
- Bill of materials for each subteam
- Validation protocols agreed
- Materials ordered
- Software requirements defined
-
Milestone 2 4 – 25 November 2026
- First build of the flow rig complete
- Potentiostat modifications complete and ready for testing
- Roll-to-roll chamber built
- Membrane design confirmed, lab access verified and materials ordered
-
Milestone 3 25 November – 11 December 2026
- Troubleshooting and debugging
- Validation of sensors and potentiostat boards
- Validation of variable flow rate and pressure
- First membrane tested on the rig
- Issues identified
Team
Get in touch
Questions about the project? Email the team.
- Sascha shl200@bath.ac.uk
- Sofiia sb3889@bath.ac.uk